🔹 Step 1: Initial Consultation & Requirement Understanding

The process starts when the customer contacts a solar provider like Soura Solar Solutions.

During this stage:

This initial call is usually completed in 10–15 minutes.


🔹 Step 2: Site Survey & Technical Assessment

A technician visits your location to conduct a detailed assessment.

The survey includes:
✔ Roof direction (south-facing is ideal)
✔ Shadow analysis using solar tools
✔ Roof strength & dimensions
✔ Cable routing plan
✔ Earthing point possibility
✔ Net meter feasibility

This inspection ensures that the solar system is designed perfectly for maximum output.

Survey duration: 20–45 minutes
Outcome: A precise system design + final quotation.


🔹 Step 3: Final Proposal, Quotation & Subsidy Guidance

After the survey, you receive a complete proposal with:

Your installer also guides you through National Portal Registration for subsidies.


🔹 Step 4: Application on the National Solar Portal

In Telangana, all rooftop solar subsidy requests are submitted on the National Portal for Rooftop Solar (MNRE).

You must upload:

After submission, your DISCOM (TSSPDCL/TSNPDCL) reviews the application.

Approval time: 3–10 days


🔹 Step 5: Installation of the Solar System

Once DISCOM approves, the installer begins the installation.

The installation includes:

Installation time:

All work follows safety standards and government-approved specifications.


🔹 Step 6: Net Metering Application & Approval

After installation, your installer applies for a net meter.

Net meter allows you to:

TSREDCO/TSSPDCL verifies the installation and approves the meter.

Net meter installation timeline: 7–25 days (depending on DISCOM load)


🔹 Step 7: System Inspection & Commissioning

DISCOM authorities will inspect the solar setup and check:

Once approved, the system is commissioned.

You then start generating your own green energy immediately!


🔹 Step 8: Subsidy Claim & Transfer

After commissioning, all documents are uploaded to the national portal:

MNRE verifies the system and releases the subsidy directly to the customer’s bank account.

Subsidy disbursal time:
30–90 days (varies based on MNRE queue)


⏳ Total Timeline of Rooftop Solar Installation in Telangana

StepTimeline
Consultation + Survey1–2 Days
Portal Registration & Approval3–10 Days
Installation1–3 Days
Net Metering7–25 Days
Subsidy Disbursal30–90 Days

Total Duration: 15–45 days
(Varies by DISCOM, system size & government approvals)


Why Choose Soura Solar Solutions?

Soura Solar Solutions simplifies the entire process for you:

✔ Free site survey
✔ Perfect system design
✔ High-quality panels & inverters
✔ Complete subsidy application support
✔ Faster net metering
✔ 25-year panel performance warranty
✔ Skilled installation team

We ensure your rooftop solar project is hassle-free, affordable, and long-lasting.


Final Thoughts

Rooftop solar installation in Telangana is now easier and more rewarding than ever thanks to:

If you are considering switching to solar, this is the best time to do it.


Leave a Reply

Your email address will not be published. Required fields are marked *

BOOK Your SLOT